Skip to content

Greater Noida and Noida · November 2026

What a commercial solar plant costs, 50 kW to 1 MW

Factories, mills, warehouses and offices pay commercial tariffs and get no subsidy, so the plant has to earn its keep on the bill. Here's what plants typically cost, and one we built where the owner said the numbers out loud.

Typical commercial rooftop solar plant cost by size
PlantTypical costUnits a monthRoof, about
50 kW₹22.5 L6,0004,500 sq ft
100 kW₹30 L – ₹50 L12,0009,000 sq ft
250 kW₹75 L – ₹1.3 Cr30,00022,500 sq ft
500 kW₹1.5 Cr – ₹2.5 Cr60,00045,000 sq ft
1 MW₹3 Cr – ₹5 Cr1,20,00090,000 sq ft

Typical turnkey prices from installers' published 2026 rates, not a DKS quote. Units assume about 120 per kW a month; roof assumes about 90 sq ft per kW of shadow-free area. Your figure comes in writing after a survey of the roof and the electrical room.

A real example

100 kW in Noida, costed on camera

For a factory we built in Noida, the film puts the plant at about 30 lakh rupees, saving up to about a lakh a month, which pays it back in roughly two and a half years. That sits at the low end of the market range above, which is typical for a plain sheet roof with a strong daytime load.

See the film and the details.

What moves a commercial price

  • Roof type: sheet roofs need a lighter structure than RCC, but more care with leaks
  • Distance from the roof to the main panel: long cable runs at this size add up
  • The electrical side: HT or LT connection, and whether the transformer has headroom
  • Panel and inverter brands. At ₹10 a unit or more, a slightly better panel can pay for itself

Questions

Commercial solar cost: questions.

Something we haven't covered? Ask the team directly.

Ask on WhatsApp
Why is the price per kW lower for bigger plants?

The fixed parts of a project, design, approvals, the meter, mobilising a team, cost roughly the same whether the plant is 50 kW or 500 kW. Spread across more panels, each kW gets cheaper.

Is GST included?

The typical prices here are turnkey figures including GST. A business registered for GST can usually claim input credit on the plant; your CA will confirm what applies.

How is a 1 MW plant different from ten 100 kW plants?

At 1 MW the electrical side changes: often a dedicated transformer or HT metering, more inverters, and a longer approval with the DISCOM. That's why we survey the electrical room as carefully as the roof.

Free survey · no obligation

Send us 12 months of bills. We'll size the plant.

An engineer visits, checks your roof and gives you a fixed written quote with your exact subsidy and savings. There's no cost and no obligation.

Step 1 of 2

About 20 seconds

Where will the solar go?
What's your business's average monthly bill?

What happens next

  1. 1.We call you back, usually within 30 minutes during working hours.
  2. 2.An engineer surveys your roof within 48 hours, Saturdays included.
  3. 3.You get a written quote naming every brand, model and warranty.
  4. 4.We file your PM Surya Ghar subsidy at no extra cost.

Mon–Sat, 9:30 AM – 7:00 PM