Greater Noida and Noida · November 2026
What a commercial solar plant costs, 50 kW to 1 MW
Factories, mills, warehouses and offices pay commercial tariffs and get no subsidy, so the plant has to earn its keep on the bill. Here's what plants typically cost, and one we built where the owner said the numbers out loud.
| Plant | Typical cost | Units a month | Roof, about |
|---|---|---|---|
| 50 kW | ₹22.5 L | 6,000 | 4,500 sq ft |
| 100 kW | ₹30 L – ₹50 L | 12,000 | 9,000 sq ft |
| 250 kW | ₹75 L – ₹1.3 Cr | 30,000 | 22,500 sq ft |
| 500 kW | ₹1.5 Cr – ₹2.5 Cr | 60,000 | 45,000 sq ft |
| 1 MW | ₹3 Cr – ₹5 Cr | 1,20,000 | 90,000 sq ft |
Typical turnkey prices from installers' published 2026 rates, not a DKS quote. Units assume about 120 per kW a month; roof assumes about 90 sq ft per kW of shadow-free area. Your figure comes in writing after a survey of the roof and the electrical room.
A real example
100 kW in Noida, costed on camera
For a factory we built in Noida, the film puts the plant at about 30 lakh rupees, saving up to about a lakh a month, which pays it back in roughly two and a half years. That sits at the low end of the market range above, which is typical for a plain sheet roof with a strong daytime load.
What moves a commercial price
- Roof type: sheet roofs need a lighter structure than RCC, but more care with leaks
- Distance from the roof to the main panel: long cable runs at this size add up
- The electrical side: HT or LT connection, and whether the transformer has headroom
- Panel and inverter brands. At ₹10 a unit or more, a slightly better panel can pay for itself
Proof
Commercial and industrial plants we've built

100 kW · Industrial
100 kW plant on a sheet roof, with a walkway down the middle

100 kW · Commercial
100 kW commercial plant powering an oil mill's expellers

100 kW · Industrial · Noida
100 kW factory plant in Noida, costed and paid back on camera

100 kW · Industrial · Greater Noida
100 kW plant running a factory's machines in Greater Noida

800 kW · Industrial · Greater Noida
800 kW industrial solar plant, with the client on the result

1 MW · Industrial · Greater Noida
1 MW on-grid solar plant for a factory in Greater Noida
Questions
Commercial solar cost: questions.
Something we haven't covered? Ask the team directly.
Ask on WhatsAppWhy is the price per kW lower for bigger plants?
The fixed parts of a project, design, approvals, the meter, mobilising a team, cost roughly the same whether the plant is 50 kW or 500 kW. Spread across more panels, each kW gets cheaper.
Is GST included?
The typical prices here are turnkey figures including GST. A business registered for GST can usually claim input credit on the plant; your CA will confirm what applies.
How is a 1 MW plant different from ten 100 kW plants?
At 1 MW the electrical side changes: often a dedicated transformer or HT metering, more inverters, and a longer approval with the DISCOM. That's why we survey the electrical room as carefully as the roof.
Free survey · no obligation
Send us 12 months of bills. We'll size the plant.
An engineer visits, checks your roof and gives you a fixed written quote with your exact subsidy and savings. There's no cost and no obligation.
What happens next
- 1.We call you back, usually within 30 minutes during working hours.
- 2.An engineer surveys your roof within 48 hours, Saturdays included.
- 3.You get a written quote naming every brand, model and warranty.
- 4.We file your PM Surya Ghar subsidy at no extra cost.
Mon–Sat, 9:30 AM – 7:00 PM
