Skip to content

100 kW · Industrial

100 kW plant on a sheet roof, with a walkway down the middle

Rows of panels across a factory's sheet roof, with a fibreglass walkway running between them so nobody ever stands on the sheet.

Size
100 kW
Roof
Metal sheet, fibreglass walkway
Filmed
September 2026

A walkway costs money and takes up roof that could hold panels, so some quotes leave it out. On a sheet roof that's a false saving. Without one, every cleaning and every inspection means walking on the sheet, which dents it, loosens fixings and eventually opens leaks.

The yellow fibreglass grating in this film is what we'd put on any industrial sheet roof: it spreads a person's weight, doesn't rust, and makes monthly cleaning something the factory's own staff can do safely.

Free survey · no obligation

Want a plant like this on your roof?

An engineer visits, checks your roof and gives you a fixed written quote with your exact subsidy and savings. There's no cost and no obligation.

Step 1 of 2

About 20 seconds

Where will the solar go?
What's your business's average monthly bill?

What happens next

  1. 1.We call you back, usually within 30 minutes during working hours.
  2. 2.An engineer surveys your roof within 48 hours, Saturdays included.
  3. 3.You get a written quote naming every brand, model and warranty.
  4. 4.We file your PM Surya Ghar subsidy at no extra cost.

Mon–Sat, 9:30 AM – 7:00 PM