Typical size 50 kW – 1 MW
Rooftop solar for factories in Greater Noida and Noida
Most factories run their heaviest load between 9 and 5, which is exactly when a rooftop plant produces. We've built industrial plants from 100 kW up to 1 MW, including one a few kilometres from our office in Greater Noida.
The problem
What usually goes wrong
- Commercial tariffs that go up nearly every year, on a load that can't be cut
- Sheet roofs that leak if someone drills through them
- Bills where demand charges and power factor penalties are half the story
- No time to chase the DISCOM for approvals and inspections
How we do it
What we do about it
- 1.We size the plant from 12 months of your bills and your sanctioned load, so you don't pay for panels that export power at a poor rate
- 2.On metal sheet roofs, a structure that sits on the sheet's profile without opening a leak, plus a walkway so cleaning never means walking on the sheet
- 3.We handle the DISCOM side, NPCL or PVVNL depending on where the unit is, from feasibility to the net or gross meter
- 4.One team for survey, installation and service. You call the same people when something needs looking at
Proof
Factories we've put solar on

1 MW · Industrial · Greater Noida
1 MW on-grid solar plant for a factory in Greater Noida

800 kW · Industrial · Greater Noida
800 kW industrial solar plant, with the client on the result

100 kW · Industrial · Greater Noida
100 kW plant running a factory's machines in Greater Noida

100 kW · Industrial · Noida
100 kW factory plant in Noida, costed and paid back on camera

100 kW · Commercial
100 kW commercial plant powering an oil mill's expellers

100 kW · Industrial
100 kW plant on a sheet roof, with a walkway down the middle
Questions
Solar for factories: questions.
Something we haven't covered? Ask the team directly.
Ask on WhatsAppIs there a subsidy for factory rooftop solar?
No. PM Surya Ghar is only for homes and housing societies. Factories recover the cost through lower bills, and many also claim accelerated depreciation. Ask your CA what applies to you.
How much roof does a factory plant need?
Roughly 80 to 100 sq ft of shadow-free roof per kW. A 100 kW plant needs about 8,000–10,000 sq ft. We measure the actual usable area at the survey, because skylights, vents and parapet shadows eat into it.
Will the plant run during a power cut?
A plain on-grid plant shuts down when the grid goes, for the safety of linemen working on the lines. If you run a DG set, a plant can be set up to work alongside it with a DG-sync controller. We'll tell you at the survey whether that suits your setup.
Free survey · no obligation
Send us your bills. We'll size it.
An engineer visits, checks your roof and gives you a fixed written quote with your exact subsidy and savings. There's no cost and no obligation.
What happens next
- 1.We call you back, usually within 30 minutes during working hours.
- 2.An engineer surveys your roof within 48 hours, Saturdays included.
- 3.You get a written quote naming every brand, model and warranty.
- 4.We file your PM Surya Ghar subsidy at no extra cost.