Skip to content

100 kW · Commercial

100 kW commercial plant powering an oil mill's expellers

A live commercial project: a 100 kW plant on the roof of an oil mill, feeding the expeller machines that run all day below it.

Size
100 kW
Business
Oil mill (expeller machines)
System
On-grid, rooftop
Filmed
September 2026

An oil expeller is about the best load solar can ask for. It runs for hours at a steady draw, almost entirely in daylight, and stops when the shift ends. Nearly every unit the roof makes gets used inside the mill, which is where the saving per kW is highest.

The film walks from the machines on the floor up to the panels on the roof, which is the right order to think about it in: start with what the business runs and when, then size the plant to match.

Food processing and small mills

  • Oil, flour and rice mills run long daytime shifts, a near-perfect match for solar
  • Dust from processing settles on panels quickly, so cleaning needs to be part of the plan from day one
  • Mills often have large sheet roofs, which suit a plant this size if the structure is fixed without opening leaks

Free survey · no obligation

Want a plant like this on your roof?

An engineer visits, checks your roof and gives you a fixed written quote with your exact subsidy and savings. There's no cost and no obligation.

Step 1 of 2

About 20 seconds

Where will the solar go?
What's your business's average monthly bill?

What happens next

  1. 1.We call you back, usually within 30 minutes during working hours.
  2. 2.An engineer surveys your roof within 48 hours, Saturdays included.
  3. 3.You get a written quote naming every brand, model and warranty.
  4. 4.We file your PM Surya Ghar subsidy at no extra cost.

Mon–Sat, 9:30 AM – 7:00 PM